Bridges linking past and present
VGP - Each bridge across the Red River can be considered a milestone in the history and becomes an integral part of the capital city of Hà Nội.
Long Biên – The first bridge over the
Its original name was Paul Doumer, after the French
governor-general who initiated its construction. Local people often called the
bridge Bồ Đề because it spans to Bồ Đề Village in Gia Lâm (now Long Biên) District.
The bridge was renamed Long Biên after the August 1945 Revolution.

This is the first steel bridge in Hà Nội, and one of the
biggest ones in the world at its inauguration. The construction started in
September 1898 with an investment of 10.5 million francs and was completed in February
1902.
The main bridge is 1,682m and the approach one is 896m. The
work consists of 19 spans on 20 piers of over 40m each (including foundation).
The bridge serves trains in the center and pedestrians at two sides.
By building the bridge, French colonists completed the most
important rail route in Indochina at that time, linking the sea city of
In the Việt Nam War, US bombs damaged 1,500 m of the bridge,
9 spans and 4 pillars. After the Paris Peace Accords of 1973, the bridge was
repaired for 41 days to serve the first train on March 4, 1973.
Besides its transport value, the
The construction of the

The main bridge is 1,688m long with the upper floor for
motorized vehicles and the lower floor (19.5m in width) for trains, pedestrians
and simple means of transport.
The bridge has 15 spans (112m long, 10m wide and 5 tons in weight
each) placed on 14 piers (18m in diameter and standing 40-60m deep underground)
and 2 abutments of 14m high each.
The lane for trains, including the approach sections, is 5,503m
long, the lane for motorized vehicles – 3,116m, and the lane for simple means
of transport and pedestrians – 2,650m. So, the bridge‘s total length is over
11,000m
![]() |
The construction of the
It has steel and concrete structures with the total length
of over 1,213m, width of 19.76m, 4 lanes for vehicles up to 80 tons. It
consists of nine approach spans, 11 main spans and 21 abutments.
The bridge is of great importance in terms of transport and
economic development. It was designed and built by Hanoian engineers and
workers.
![]() |
Thanh Trì is the biggest among bridges across the
The bridge has the total length of over 12,000m, with the
main bridge being 3,084m in length, 33.10m in width. It was designed with 6
lanes, including 4 lanes for vehicles to run at 100km/h. The bridge is placed
on 52 pillars and 2 abutments.
This is one of the longest and widest pre-stressed concrete
bridges in Việt
![]() |
Its total length is 5,830m, with the main bridge running 3,778m
over the water surface. This pre-stressed concrete bridge has 77 spans,
including 6 navigation spans of 135 m long each.
The bridge has 2 lanes for motorized vehicles, 1 lane for
buses and 1 lane for other means of transport.